News

trang cá cược bóng đá TOPPING OUT CEREMONY OF VINHOMES GRAND PARK PHASE 1– L15

On trang cá cược bóng đá morning of November 11, 2019, CENTRAL & VINGROUP organized trang cá cược bóng đá Topping Out Ceremony of VINHOMES GRAND PARK PHASE 1 – L15 at District 9, HCMC.

trang cá cược bóng đá ceremony was honored to welcome

  • From Investors – VINGROUP
    • Mr. Trinh Chi Cong – Project Director
    • Mr. Nguyen Anh Tuan; Mr. Nguyen Phi Nam – Consultants Manager
  • From Contractor CENTRAL
    • Mr. Vu Ba Cuong, Mr. Duong Hong Cong, Mr. Vo Minh Thanh, Mr. Nguyen Dinh Le – Site Manager in common with supplier, Sub-contractors, and SMB project
Mr. Trinh Chi Cong and SMB project making an incense offerings

At trang cá cược bóng đá project, CENTRAL is a general contractor for 8 Towers. trang cá cược bóng đá contractor uses trang cá cược bóng đá new construction method – FULL TOP DOWN – building a basement and trang cá cược bóng đá body at trang cá cược bóng đá same time

Perspective of Vinhomes Grand Park

L15 is 2 basements located in phase 1. CENTRAL acts as General Contractor for construction finishing structure and MEP. SMB has exceeded trang cá cược bóng đá Toping out before 1 month as required schedule from trang cá cược bóng đá Investor

Real construction photo at L15
Image of installing MEP system of apartment
Image of trang cá cược bóng đá concrete surface after striking formwork
Image of installing precast wall panel
Image of finishing work.

This ceremony was a warm, cheerful atmosphere. Immediately after trang cá cược bóng đá Topping Out ceremony, SMB L15 continued to urgently implement trang cá cược bóng đá finishing work, satisfying trang cá cược bóng đá requirements of trang cá cược bóng đá Investor.

Post related